Client: General Directorate for National Roads and Motorways - Białystok branch

  • General Contractor: Budrex-Kobi Sp. z o.o.- Consortium Leader, PDM “MAKSBUD” Sp. z o.o. - Consortium Partner
  • Time limit for performance: 03.06.2011 - 05.10.2011

Scope of Works:

  • Road works;
    • clearing of trees and shrubs;
    • soil stripping;
    • demolition of engineering structures (cutting and crushing of RCC elements);
    • disassembly of road and street furniture;
    • earthworks (excavations and fills);
    • bed protection with profiling and compaction;
    • execution of compacted aggregate base;
    • bituminous works (clearing and application of tack coat on structural layers, sub-base laying, execution of a binding course, bitmac wearing course and SMA wearing course);
    • placing of a concrete pavement 20x30 cm, block paved pathway (thickness: 8 cm), and a concrete edge restraint (thickness: 8 x 30 cm);
    • slope and ditch stabilisation along feeder roads;
    • road marking;
  • Bridge works;
    • foundation subbase stabilisation (sheet piling, B20 blinding concrete placing);
    • strip footing (steel fixing works, concrete works);
    • cold bituminous waterproofing;
    • assembly of a corrugated steel tubular deck;
    • placement of polypropylene geotextile and geomembrane;
    • placement of a subsoil drainpipe drainage system;
    • placement of embankments;
    • sealing of strip footing expansion joints;
    • placement of steel guardrails;
    • execution of embankment stairway (execution of prefabricated stairs and steel parapet, parapet steel structure painting);
    • slope stabilisation;
    • concrete surface treatment;
    • watercourse channel improvement