Client: General Directorate for National Roads and Motorways - Białystok branch
- General Contractor: Budimex Dromex S.A.
- Time limit for performance: 20.04.2004 – 31.05.2005r.
Works performed:
- preparatory works, including soil stripping and disassembly works;
- earthworks – excavations and fills;
- corrugated steel culverts (pipe-arch section), L11 – 44 m (2 pcs.);
- corrugated steel culverts (pipe-arch section), L14 – 59 m (2 pcs.);
- corrugated steel culverts (pipe-arch section), L50 – 53 m (2 pcs.);
- corrugated steel culverts (circular cross-section), ø 1000 mm – 181 m (7 pcs.);
- corrugated steel culverts (circular cross-section), ø 1400 mm – 27 m (1 pcs.);
- corrugated steel culverts (circular cross-section), ø 1600 mm – 69 m (2 pcs.);
- finishing works: protection of slopes, ditches and drains.
The redevelopment of National Road No. 61, Warsaw- Augustów, section: Grabowo-Szczurzyn from km 189+961 to km 200+936