Client: Białystok City Office, ul. Słonimska 1, 15-950 Białystok

  • General Contractor: Budrex-Kobi Sp. z o. o.
  • Time limit for performance: 01.03.2008 – 30.07.2008r.

The works included:

  • stripping of all layers, down to the deck;
  • structure reinforcement through bonding steel flat bars (16x150 mm) to the slab bottom; deployment: every1.0 m;
  • execution of sidewalk pavement with the use of synthetic resins, thickness: 3 mm;
  • execution of carriageway pavement with the use of synthetic resins, thickness: 10 mm;
  • execution of transition slabs on supports;
  • assembly of new modular expansion joints anchored in the superstructure;
  • execution of new combination railings.

Charakterystyka obiektu

  • element wartość m2